Meeting called to order at 8:02 PM. About 14 members and 1 guest were present.
.
Officer Reports
Secretary:
Minutes for the July meeting are on the CVAS website.
Treasurer:
Bank–Member dues were summarized. $797.52 in Bank, Petty Cash - $2.00, Electric Fund - $50.00 Total - $859.59
1. Paid phone bill
2. Electric installation expenses this month: about $780 to First Energy to install the meter and connect to our side, $1,181 to Larry for various wire, cable, connectors, etc and $300 to the electrician who helped us install the line on July 15. Total cost to install phase 1 was about $2,300. This does not include Marty's out of pocket expense for the trencher.
3.
Paid $153 for quarterly insurance.
4. Land balance is $5,700
Observatory Director:
From last month, the 12 inch Meade communication module is not working. Marty continues to check out the problem.
Electric installation work session:
- July 14. Marty and son dug a trench to bury the electric cable.
- July 15. Cable buried in trench, meter installed and wiring completed to north observatory. A few trees taken down on the east boundary and just south of the north observatory.
-
.Marty created a larger path to drive up the hill and cleared out a parking area next to the shed. Landscape carpet was placed on the parking spot. We'll need to buy and dump gravel on the spot.
- Marty dumped 10 tons of gravel on the electric trench and the expanded drive up the hill.
- Steve Kainec bought a first aid kit. It has more stuff than the kit on the hill (which is over 10 years old).
Director of Observations:
Bobs report was handed out. For Bob's complete observation report, please visit the Monthly Sky Calendar on our website. He talked with State Farm about replacing our current $594 annual insurance expense. Potential to reduce it to $390.
Editor:
No update.
Guests: Barry Spence
Old Business:
- Dan said that Oberle scope project is being delayed until next year with drive way and utilities
- Light Pollution -
Larry is preparing for a deposition on Tuesday August 8 in Akron at First Energy
.
New Business:
- There were some additions to the calendar of events. Penn Glenn is next Saturday. Larry will talk to Lake Metro Parks about some kind of income from this star party
- Larry is planning a trijp to the Black Forest Star Party on from August 25-27. Danny is also going.
Motion to adjourn at 8:58 PM. Partly cloudy skies gave way to some clear sky by dark. Haze and some clouds continued during the evening.
|